First deployment

Our first deployment is our own.

The Atlas Economic Zone in Ghana is where the system is built and proven. Goods and services are made for the campus first, then the region, then export.

Satellite view of Africa and the Atlantic with the Atlas Economic Zone, Ghana marked and capital routes drawn from New York, London, Dubai, Oslo and Hong Kong

Imagery © Esri, Maxar, Earthstar Geographics · Design-basis preview

We are our own first customer

Power and compute, built on site.

A data-centre campus beside self-generated power, so the machines never queue for a grid. A waterfront LNG terminal and gas-to-power plant feed the zone.

Data-centre campus, blocks A to F, 15 acresWaterfront LNG terminal and 35 km pipeline≈11,525 GWh a year generated against ≈10,056 consumed
Design render of the Atlas data-centre campus: six blocks with rooftop plant beside a campus road
Data-centre campus · design render
Design render of the waterfront LNG terminal and gas-to-power plant
LNG terminal and power plant · design render
Built on campus

What the campus makes.

Fitted homes

Homes built in Ghana, fitted with the Atlas smart-home stack.

The works

Prefab structures, solar panels and vehicles, assembled on site.

Power and compute

Self-generated power beside a 15-acre data-centre campus.

Archviz and master planning

Designed in software before it’s built in steel.

Parcels, districts, massing, sun studies and flythrough film, georeferenced to real ground. It is how the campus is planned and shown, and it ships to Workspace as Urban Design Studio.

Street-driven planningSun studies and massingFlythrough export
Atlas Economic Zone master plan, georeferenced
AEZ master plan · design basis

Design renders and design-basis figures, subject to FEED and statutory approval. None are measured performance.